Commissioning Buildings
From: Diana Porter (porterdcinci.rr.com)
Date: Fri, 27 Jul 2007 14:11:50 -0700 (PDT)
In LEED buldings, commissioning is a pre-requisite and must be built into the project from the beginning:

-Engage a commissioning agent
-Include commissioning requirements in the construction documents
-Write a commissioning plan and use it throughout design and construction
-Verify installation and functional performance of all system
-Document results and develop a commissioning report

This can cost up to $1.50 per square ft but most people say it saves money in the long run. Read more about it on the US Green building council site

Http://www.usgbc.org

 or

http://www/peci.org/commissioning.htm

Diana Porter









  • (no other messages in thread)

Results generated by Tiger Technologies Web hosting using MHonArc.