Commissioning Buildings | <– Date –> <– Thread –> |
From: Diana Porter (porterd![]() |
|
Date: Fri, 27 Jul 2007 14:11:50 -0700 (PDT) |
In LEED buldings, commissioning is a pre-requisite and must be built
into the project from the beginning:
-Engage a commissioning agent -Include commissioning requirements in the construction documents-Write a commissioning plan and use it throughout design and construction
-Verify installation and functional performance of all system -Document results and develop a commissioning reportThis can cost up to $1.50 per square ft but most people say it saves money in the long run. Read more about it on the US Green building council site
Http://www.usgbc.org or http://www/peci.org/commissioning.htm Diana Porter
- (no other messages in thread)
Results generated by Tiger Technologies Web hosting using MHonArc.