Re: Preparing for electric cars on site | <– Date –> <– Thread –> |
From: Sharon Villines (sharon![]() |
|
Date: Tue, 8 Mar 2016 05:44:46 -0800 (PST) |
> On Mar 7, 2016, at 11:14 AM, Chuck Harrison <cfharr [at] gmail.com> wrote: > > At Duwamish Cohousing in Seattle we are also thinking about "amping up" our > EV charging capacity. > > I'm a geek, so there is a geeky proposal draft in progress: > https://docs.google.com/document/d/1s6DU1Zq-ZFny1LUZ3pU1gCTZKxb_RY_3oDYptKS1_ZE/edit?usp=sharing > > I would be really happy to have some others come on board with us in making > a design that could be economically replicated in other places. I would like to distribute this to our community. We have an electrical engineer and others who work in high level energy related jobs who might be interested. This is an issue we will be facing soon as electric cars become more accessible. I can’t promise they will be interested but it’s worth an effort. Perhaps others could do the same. Sharon ---- Sharon Villines Takoma Village Cohousing, Washington DC http://www.takomavillage.org
- Preparing for electric cars on site, (continued)
-
Preparing for electric cars on site Thomas Lofft, February 20 2015
-
Re: Preparing for electric cars on site Jerry McIntire, February 20 2015
- Re: Preparing for electric cars on site Catya Belfer, February 22 2015
-
Re: Preparing for electric cars on site Jerry McIntire, February 20 2015
-
Re: Preparing for electric cars on site Chuck Harrison, March 7 2016
- Re: Preparing for electric cars on site Sharon Villines, March 8 2016
- Re: Preparing for electric cars on site Chuck Harrison, March 8 2016
- Re: Preparing for electric cars on site Chuck Harrison, March 10 2016
-
Preparing for electric cars on site Thomas Lofft, February 20 2015
Results generated by Tiger Technologies Web hosting using MHonArc.